Work day at El Salto

 

 

Marcos next to the cistern. The walls are done, now we will pour the floor of the

tank. After that the top will be poured.

 

 

A view from the back side, you can see the drain pipe. When the system is finished

 we will be able to get water from this drain or from a home-made hand pump mounted

 to the top of the cistern.

 

 

 

Marco's brother sitting on the steps that will allow us to access the top of the water tank.

 

           

 

If you would like to copy any of the pictures posted on this website please contact us first.

© 2008 downinmexico.org