![]() |
|
Work day at El Salto
Marcos next to the cistern. The walls are done, now we will pour the floor of the tank. After that the top will be poured.
A view from the back side, you can see the drain pipe. When the system is finished we will be able to get water from this drain or from a home-made hand pump mounted to the top of the cistern.
Marco's brother sitting on the steps that will allow us to access the top of the water tank.
|

If you would like to copy any of the pictures posted on this website please contact us first.
© 2008 downinmexico.org